Woodburn Engineering Ltd

We are proud of our reputation for quality work and proven results. We endeavour to produce the right solution for our clients the first time every time.

icon_widget_image Monday-Friday: 9am to 5pm; icon_widget_image Trailcock Road, Carrickfergus, BT38 7NU, Northern Ireland icon_widget_image +44 (0)28 9336 6404 icon_widget_image admin@woodburnengineeringltd.com

Tolka Road Bridge Project

Tolka Road Bridge Project

Dublin Port needed to construct a Road Bridge from the Port across the Tolka Road and onto their site, this site is used to store new cars and other vehicles. The total span of this bridge was x120metres and weighed 210 tonnes and was constructed in x5no sections that were fabricated at Woodburn Engineering’s works in Carrickfergus. Extreme accuracy was required in the production of the joints in order to enable assembly of the final fabricated sections. The erection sequence was completed during a series of night time road closures and included the lifting of sections into position onto bearings supplied by Woodburn. Construction commenced in August 2013 and was complete for Jan 2014.

Project Info

Category:
Date: