Part funded by Belfast City Council, this Boardwalk allows walkers and cyclists access to the city centre from the South by connecting into the Connswater access route.
The board walk was constructed from steel sections cantilevered from a concrete flood wall providing support for a steel plate deck and an anti-slip covering with a high coefficient of friction. The board walk totalled over 1.5km of walkway in x3no sections, 2500mm wide with a stainless steel wire in fill parapet running the entire length.
The main contractor was Farrans Construction of Kingsway Belfast.